Case Study: Ultimate Internet Access Inc.
After demoing the FH-R material placement attachment for a day, we were impressed with the results and decided to purchase one. Since then, I have continued to be happy with the ways the FH-R has boosted efficiency as we install 1-gig fiber for high-speed internet. The FH-R allows us to place asphalt exactly where we need it, eliminating a lot of shoveling and hand work. Less shoveling means less manual labor required which allowed us to double the production time with half the crew. The simplicity of this attachment makes it reliable and user-friendly. It operates exactly as advertised and we expect it to continue to be a tremendous asset to our operation."
– John Zuber, Chief Instruction Officer at Ultimate Internet Access Inc.
READY TO BACKFILL TRENCHES FASTER?
Share
Read more

Ligchine Releases the all-new SCREEDSAVER ULTRA PLUS at World of Concrete 2023
Darien, WI, January 27, 2023– Ligchine International, a worldwide leader in laser-guided concrete screeds, is excited to announce the release of an all-new product, the SCREEDSAVER™ ULTRA PL...

Case Study: Q&D Construction-Energy Division
Case Study: Q&D Construction-Energy Division The FH-R material placement attachment cut a 4-step process down to just 2 steps. Rather than dumping material on the road and pushing it with equ...

